Rising component costs may adjust prices on selected items without prior notice. Supply constraints may add shipping time — we’ll notify you if affected. OEM costs and supply tightening — contact us to secure stock and pricing. For projects or bulk orders, choose “Request for Quotation” on any item.
Call our specialists(65) 6978 3502 Email our sales teamsales@sourceit.com.sg

Servers & Power

HPE XD685 vs XD690 vs Cray XD670: Three 8-GPU AI Servers, One Sensible Choice

HPE's 8-GPU AI servers carry three names that look like a typing test: Cray XD670, ProLiant Compute XD685 and Compute XD690. All three hold eight flagship GPUs. All three are aimed at training and large-scale inference. They are not interchangeable.

The quick way to tell them apart is to ignore the model numbers and ask two questions. Which GPU generation do you need? Does your data hall have a liquid loop?

The three servers in pictures

Compare HPE Cray XD670Cray XD670 HPE ProLiant Compute XD685ProLiant Compute XD685 HPE Compute XD690Compute XD690
GPU options
8 per server
NVIDIA H200 NVIDIA H200NVIDIA B200NVIDIA B300AMD MI355X NVIDIA B300
Newest GPU generation
3 blocks = latest

Hopper
previous generation

Up to Blackwell Ultra
your choice of three generations

Blackwell Ultra
current generation only
Processors Intel
2 × Xeon, 5th Gen
AMD
2 × EPYC, 5th Gen
Intel
2 × Xeon 6
Cooling AirLiquid
either works
LiquidAir (H200 only)
liquid for every GPU
Air
no plumbing
Needs a liquid loop? No Yes, unless H200 No
Chassis height
shorter fits more per rack
5U
5U liquid
6U air
10U
In one line The proven one The flexible one The no-plumbing one

Sources: HPE AI Servers, HPE ProLiant Compute XD685 QuickSpecs. Chassis heights for the XD670 and XD690 are as shown on SourceIT's product listings; confirm against the current HPE QuickSpecs when configuring. Height bars are scaled to 10U.

Cray XD670: the proven one

The XD670 pairs eight NVIDIA H200 GPUs with two Intel Xeon processors and runs on air or direct liquid cooling. The H200 is a generation behind the Blackwell family, which is exactly why some buyers want it. The software is mature, and it runs comfortably in air-cooled halls.

The catch: you are buying yesterday's flagship. For teams whose models fit and whose code already runs on Hopper-class GPUs, that is a feature. For anyone planning around the largest new models, it is a ceiling.

ProLiant Compute XD685: the flexible one

The XD685 is the widest menu of the three. On two AMD EPYC processors it takes NVIDIA H200, B200 or B300 GPUs, or AMD's Instinct MI355X. HPE's QuickSpecs describe a 5U chassis for direct liquid cooling and a 6U chassis for air.

The catch is in the cooling rules. HPE offers direct liquid cooling for every GPU option, but air cooling only for the H200. In practice, if you want the XD685 with a current-generation GPU, you need a liquid loop.

Compute XD690: the no-plumbing one

The XD690 exists to answer one question: how do you run eight Blackwell Ultra GPUs in a hall with no liquid? HPE lists it with eight air-cooled B300 GPUs and two Intel Xeon 6 processors.

The catch is physical. Moving that much heat with air takes space and airflow, and the chassis is roughly twice the height of its liquid-cooled sibling. You get fewer servers per rack, and each one still demands serious power and cold air. Air-cooled does not mean easy to host. It means no plumbing.

The sensible choice

Your data hall You want current-generation GPUs Previous generation is enough
Liquid loop available XD685
B300, liquid-cooled, 5U
XD685 or XD670
H200
Air only XD690
B300, air-cooled, 10U
XD670
H200, air-cooled, 5U

For most Singapore buyers in existing colocation space, that table reduces to one line: air-only hall and you want Blackwell Ultra, look at the XD690; liquid available, look at the XD685. The XD670 remains a reasonable buy where the H200 does the job and price or lead time favours it.

The slightly provocative conclusion: HPE's three-server line-up is really a map of the industry's cooling transition. One server for the air-cooled past, one for the liquid-cooled future, and one very tall box for everyone stuck in between.

Not sure whether you need eight GPUs at all? Start with Are Businesses Buying AI Servers Before They Have a Real AI Strategy?

Related on SourceIT

SourceIT Approved

SourceIT Approved

Researched and verified by the SourceIT team for Singapore buyers.

Share This Article
Facebook

More from our blog


← Older Post Newer Post →